Manual Point Awards
Manual point awards let admins directly credit reputation points to a publisher's account. Every award requires a reason note — ensuring the publisher understands why they received the points and the action is traceable in the audit log.
Issuing a Manual Point Award
Award Size Rules
| Award Size | Processing | Reason Required |
|---|---|---|
| 1 – 500 pts | Immediate — credited on submit | Minimum 20 characters |
| 501 – 5,000 pts | Pending — requires second admin approval before credit | Minimum 20 characters |
| 5,001 – 10,000 pts | Pending — requires second admin approval before credit | Minimum 100 characters (extended justification required) |
What Happens After Award
When an award is credited (either immediately or after approval):
- Points are added to both the publisher's lifetime points total and their weighted score
- If the award pushes the lifetime total past a tier threshold, the publisher immediately advances to the new tier
- The event appears in the publisher's reputation log labeled "Admin Award" with the reason note
- The publisher receives an in-platform notification and email with the point amount and reason
- The action is recorded in the reward audit trail with the issuing admin's identity and timestamp
Deducting Points
Points can be deducted using the "Deduct Points" action on the publisher's record in Rewards Management. Deductions follow the same approval rules as awards — deductions over 500 pts require dual-admin approval. Deductions are recorded in the audit log separately from awards.
Like certification revocation, manual point deductions reduce both the lifetime total and the weighted score, but they do not reduce the publisher's tier. Tier is protected. A Gold publisher who has 500 pts deducted does not drop to Silver even if the deduction brings their lifetime total below 5,000 — because tier, once earned, is permanent.
Common Award Scenarios
| Scenario | Suggested Points | Example Reason Note |
|---|---|---|
| Beta program participation (light) | 100 – 250 pts | "Participated in Q2 2026 EdgeStream beta testing program — completed 3 test sessions and submitted feedback reports" |
| System error correction | Varies (match the lost points) | "Correction for install points not credited 2026-04-01 to 2026-04-15 due to tracking bug — 340 installs verified via server logs" |
| Conference presentation | 200 – 500 pts | "Presented BizFirstGO integration use case at TechConnect 2026 — session recording confirmed 150+ attendees" |
| Major ecosystem contribution | 500 – 2,000 pts | "Authored the official BizFirstGO FlowStudio integration template used by 40+ community developers — approved by ecosystem team lead" |